2013年9月5日星期四

The world's first never out of Huawei electrical switch S5700-BAT


Huawei in CCUB  the first enterprise network conference, facing the global firstindustry first never power-off switch S5700-BAT. S5700-BAT series withoutstanding performance built-in battery, strong endurance, intelligent power management, the first appearance attracted thousands of people live on.
As the industry's first built-in battery switch, which is mainly applied to the 3 scenes: the network access layer, the aggregation layer frequent blackouts;with no power or power is not stable, for temporary emergency network ornetwork power supply instability of the scene. In addition, the external solarpanel for charging scheme for batteries also in planning; in the absence ofpower, for external solar panel to the battery to charge the temporaryemergency network, for remote area power supply; and the difficult areas.

Network equipment power means that the disruption and economic loss ofbusiness. Reliability design of enterprise network IT focus on the network, in order to ensure the network equipment redundancy and reliability, usually oftwo node as well as in the laboratory configuration expensive UPS power, but often UPS only on the core equipment and data center power supply, thepower to protect the access layer equipment, are often too busy. Therefore, in the core equipment and terminal notebook energized condition, the access layer equipment into the weak point of network interruption. In order to solve this problem, Huawei launched the battery switch, can be built-in lithium battery, but also can be connected with lead-acid batteries, ADLE the powerbusiness life. Green energy technology based on Huawei, battery switch has strong endurance, the largest independent power supply time more than 11 hours, the battery life of up to more than two years. At the same time, the battery switch supports intelligent power management technologies Huawei,visual display of battery types, capacity, status and other parameters, can be like mobile phone battery, allows you to keep track of the state of the batteryand endurance, convenient maintenance personnel in battery managementand maintenance. The battery or failure, will immediately report the police,help the maintenance staff to understand the state analysis and fault battery,reduce customer TCO input.
As a high degree of integration equipment, battery switch to meet customerdeployment flexibility, high reliability, green network requirements. There the battery switch, blank padded the access layer equipment electric technology,security, all levels of each node in the network of sustainable, really let the customer service implementation never interrupt.
more information ,you can visit  
http://nicolehong.tumblr.com/

没有评论:

发表评论